0630hrs: Departed Cape Upstart heading for Bowling Green. Wind from the south veering to the east, 5 to 10kts.
Motor sailed most of the way to Cape Bowling Green.
1400hrs: Arrived at Cape Bowling Green
A daily log of the happenings onboard the sailing catamaran Palawa Dreaming.
0750hrs: Departed Pearl Bay to head to Port Clinton. Wind 1-3kts from the southeast Back in mobile service wind for cast to strengthen fr...
No comments:
Post a Comment